• Home
  • About
  • Links
  • Login
  • Contact
  • search

Building a "Sevenesque" Roadster
  • Home
  • About
  • Links
  • Login
  • Contact
  • search

  • Home
  • About
  • Links
  • Login
  • Contact
  • search
  • intro
  • 3D models
  • plans
  • assembly
  • donors
  • powertrain
  • budget
  • parts

Would you like to know when this website changes?

  • - Email
  • - RSS

 

As seen on...

Facebook
Twitter
Car and Driver

 

Assembly Process - Table of Contents

Entries by Title

Click on an entry title below to view the full text of that entry.
  • 01. Lower Rail layout
  • 02. Front End Assembly
  • 03. Front End Applied to Lower Rails
  • 04. Design Change on-the-fly
  • 05. Top Rail Layout
  • 06. Vertical Uprights - Firewall
  • 07. Ready for Inspection
  • 08. Vertical Uprights - Dashboard
  • 09. Rear Bulkhead Sides
  • 10. Rear Bulkhead Top Rail
  • 11. Rear Bulkhead Supports
  • 12. Rearend Bottom Layout
  • 13. Rearend Bottom Kick-up
  • 14. Rearend Lower Tube
  • 15. Rear Bulkead Support - Aft
  • 16. Rearend Lower Tube Support
  • 17. Rearend Upper Tube
  • 18. Cockpit Door Sill
  • 19. Tunnel Front Uprights
  • 20. Tunnel Lower Cockpit Rails
  • 21. Tunnel Bulkhead Cross Rail
  • 22. Tunnel Lower Front Rails
  • 23. Tunnel Upper Front Rails
  • 24. Chassis Tubing Ends
  • 25. Rear Axle
  • 26. Trailing Arms
  • 27. Trailing Arm Bushings
  • 28. Trailing Arm Brackets - Axle
  • 29. Trailing Arm Brackets - Chassis
  • 30. Rear Panhard Support
  • 31. Panhard Axle Bracket
  • 32. Panhard Chassis Bracket
  • 33. Panhard Rod
  • 34. Preparing Front Struts
  • 35. Converting Struts to Uprights
  • 36. Lower Control Arms
  • 37. Upper Control Arms
  • 38. Front Coil-over Shocks
Copyright © 2001-2012, Jim McSorley. All rights reserved.